KURZ accomplished a site-welded XXL-Silo with 2212 m³ volume. The prefabricated individual parts were delivered in sizes appropriate for transport and installation and were installed and welded on site in only 2.000 hours. Various aeration boxes positioned on different levels within the silo cone assure a reliable product discharge. The silo can be under ridden and is fitted with a loading system including the electronic control and the filter. The project was extensively overseen by KURZ, started with engineering inclusive transport and assembly up to commissioning. |