Project No. | 13715 | ![]() |
Industry | Power stations | |
Installation site | Germany | |
Implementation | October 2010 | |
For a new bulk handling installation for explosive coal dust KURZ Silosysteme delivers two silos with 720 m³ each. The silos are fitted with all necessary equipment to prevent dust explosions. This comprises among others explosion doors, level measurement, temperature measurement, gas analysis and equipment for inerting. The installation includes a pipe bridge of 50 m for wagon unloading and a loading terminal with truck weighing. The silos can be underridden in two lanes. The breeches-type outlets are constructed to fit the distance of the loading opening of silo trucks. Therefore loading times can be reduced. A working platform across the two silos makes maintenance work easier. Despite the difficult transport conditions by inland waterway craft the project was accomplished in due time. Scope of supply: 2 site-welded silos Volume: 720 m³ Silo height: 21,500 mm Diameter: 6,200 mm Cone: 70° with breeches-type outlet | ||
Steel construction with enclosure Working platform Pipe bridge for wagon unloading Transport by inland waterway craft from Lauffen/Neckar to Brandenburg | ||